Short answer

When you look for a new-build apartment in Fatih, the first thing to know is that the whole district falls under Historic Peninsula conservation plans, and building heights are set parcel by parcel in metres. Much of the new stock comes from old buildings rebuilt through build-in-exchange deals or urban renewal: according to a Fatih Municipality statement of 17 August 2026, 911 building permits had been issued and 6,215 new units produced in its urban renewal work. For any new flat, check the occupancy permit (iskan) and whether the title has moved to condominium ownership (kat mülkiyeti).

Looking for a new-build apartment in Fatih is different from searching in Istanbul's new housing districts. The whole district is a conservation area, and a new building usually rises on the site of an old one, under protection rules. This guide explains where new apartments come from and what to check before you buy.

Why is new construction limited in Fatih?

Building in Fatih follows the conservation-purpose zoning plans prepared for the Historic Peninsula. According to Fatih Municipal Council decision 2024/154:

Plan Scale Approval date
Historic Peninsula Conservation-Purpose Master Zoning Plan 1/5000 30 December 2011
Conservation-Purpose Implementation Zoning Plan 1/1000 4 October 2012

The plans give height in metres, parcel by parcel, not in number of floors. In the Ayvansaray example in the same decision, the 2012 plan shows part of the residential area as "H:9,50" (a height value, in metres under the usual plan convention; the decision itself prints no unit). Every parcel can differ, so ask for the height of your own parcel. Ask Fatih Municipality for the zoning status (imar durumu) document of the parcel.

Parcels next to or facing a listed building can need extra conservation approvals, and the process can take longer. For your own parcel, ask Fatih Municipality and the regional conservation board directorate about current practice.

Where do new apartments come from?

An important source of new flats in Fatih is the demolition and rebuilding of existing buildings. Fatih Municipality's statement of 17 August 2026, as reported by DHA, shows the scale. The report does not give a start year for the totals:

Indicator Figure (statement of 17 August 2026)
Buildings found risky 1,961
Risky buildings demolished 1,114
Building permits issued 911
New units produced 6,215 (4,330 housing, 1,885 workplaces)

Some of these flats go back to the former owners and some fall to the developer's share and are put up for sale. There are two routes:

  • Build-in-exchange (kat karşılığı): Owners transfer part of their land shares to a developer and receive flats in the new building. According to a Hukukçular Evi guide updated in November 2026, the contract must be made in notarial form (noterde düzenleme); an ordinary private written contract is in principle invalid.
  • Urban renewal: Owners decide on a building found to be risky, and rebuilding runs under Law No. 6306. For a listed building, demolition and rebuilding needs the conservation board's permission. See urban renewal in Fatih for the steps.

Buying while the building is under construction

For a flat in a project at the construction stage, the title is kat irtifakı. According to Hukukçular Evi, a buyer who holds only a notarised promise of sale has a personal right; if the promise is annotated on the title, it can be raised against later owners, but a promise made to a developer cannot be annotated while the land share is still not in the developer's name. We explain the form in promise of sale agreement in Turkey.

If the seller is a company or developer and you pay before delivery, the Regulation on Off-Plan Housing Sales applies. According to the consolidated text of the regulation, including the August 2022 amendment (in force 1 October 2022):

Rule Detail
Permit No sales contract before a building permit is issued
Form Written contract with registration of the unit transfer in the buyer's favour, or a promise of sale made before a notary; otherwise the contract is invalid
Withdrawal right 14 days, without reason or penalty
Termination After the withdrawal period, you can still terminate within 24 months of the contract date without giving a reason; the seller can claim taxes, fees and compensation of up to 2% (first 3 months), 4% (3–6), 6% (6–12) and 8% (12–24 months) of the contract price
Delivery period At most 48 months from the contract date (36 months before the 2022 amendment)
Guarantee In projects with 30 or more homes, building completion insurance or another guarantee listed in the regulation (such as a bank letter of guarantee) before sales start
Pre-information form Given at least 1 day before the contract

Have a lawyer check the contract before you sign.

What happens if delivery is late?

In build-in-exchange projects, delay means more than waiting. According to the Hukukçular Evi guide, if the developer is in default, landowners can terminate the contract. Early in construction, termination works retroactively and transferred land shares go back; when the building is largely finished, courts generally apply termination for the future only. The guide also says a good-faith buyer who has registered title is protected even if the contract is later terminated retroactively, but this depends on the case, so consult a lawyer. For off-plan sales, Hukukçular Evi's pre-sale guide says handing over the keys without an occupancy permit does not count as delivery. Therefore write the delivery date, the late-delivery penalty and who is responsible for the permit clearly into the contract.

In a finished building: iskan and condominium ownership

If the title of a new flat has not moved to condominium ownership (kat mülkiyeti), the building may not have its occupancy permit (iskan) yet. According to Circular 2021/2 of 12 July 2021 of the General Directorate of Land Registry and Cadastre (TKGM), once the occupancy permit is uploaded to the MAKS spatial address system, the cadastre office sends a registration notice and the land registry office registers the change of land category; the title is then converted from kat irtifakı to kat mülkiyeti ex officio, and these procedures are exempt from the revolving fund service fee. So in a finished-looking flat that is still kat irtifakı, the first question is why the permit has not been issued. See kat irtifakı vs kat mülkiyeti and the iskan occupancy permit.

What extra steps does a foreign buyer face?

The title deed steps are the same for foreigners. Plan for the valuation report and, if you do not speak Turkish, a sworn translator at the land registry. Our guides on the valuation report for foreign buyers and on title deed appointments and translators cover the timing. For VAT on new homes, see VAT on property in Turkey. This guide is general information, not legal advice; ask a lawyer to review your contract. For the area itself, see the Fatih page.

Frequently Asked Questions

Can a developer sell me a flat before the building permit is issued?

For off-plan sales, no. Under the Ministry of Trade's Regulation on Off-Plan Housing Sales, a seller may not sign an off-plan housing sales contract before obtaining a building permit. Put the permit date and number in the contract and confirm them with the municipality.

Is VAT included in the price of a new flat in Turkey?

Not automatically. According to the Revenue Administration's summary, the VAT rate on a developer's housing delivery depends on the permit date, the net floor area and whether the project is an urban renewal project. The rates themselves changed in July 2023 and the Revenue Administration summary predates that change, so ask an accountant for the current rate. Have the contract say whether VAT is included.

As a foreigner, do I need anything extra when buying a new flat in Fatih?

The same title deed steps apply, including a valuation report and a sworn translator if you do not speak Turkish. Allow time for the appointment. See our guides on the valuation report and on appointments and translators before you pay a deposit.

Sources

  1. Fatih Municipal Council, decision 2024/154 (Historic Peninsula conservation plans, Ayvansaray block 2872) (Turkish) · 10 October 2024
  2. DHA, Urban renewal mobilisation in Fatih (Fatih Municipality figures, 17.08.2026) (Turkish) · 17 August 2026
  3. Hukukçular Evi, Pre-sale (off-plan) housing rights (Turkish) · 2 November 2026
  4. Hukukçular Evi, Build-in-exchange contract (Turkish) · 2 November 2026
  5. TKGM, Circular 1907 (2021/2), 12.07.2021, consolidated text (Turkish) · 12 July 2021
  6. Ministry of Trade, Regulation on Off-Plan Housing Sales brings important changes (Turkish) · 27 November 2014
  7. Alomaliye, Regulation on Off-Plan Housing Sales (consolidated text) (Turkish)
  8. Capital, Maximum delivery period for off-plan sales extended (04.08.2022) (Turkish) · 4 August 2022
  9. Revenue Administration (GİB), VAT rate on housing and workplace deliveries (Turkish)

The information on this page is for general guidance only and does not constitute legal, tax or investment advice. Figures relate to the source and date stated.

This guide was drafted with AI assistance; its figures and sources were checked separately against the source pages before publication. We recommend that you consult a professional before making legal or tax decisions.